亚洲国产成人精品在线播放_日韩第一页在线观看_人人插人人摸精品在线视频_日韩黄色成人电影_国产人成无码视频在线观看_国产91热爆ts人妖系列_免费观看欧美一级_午夜影院操一操黄片_午夜大片免费爽爽爽影院_日本少妇中文三级

Contact Us

Address: 1st Floor,Building 4, 1088th, Huyi highway, Shanghai
TEL:021-31080981
Email:soline@soline.com.cn
P.C.:201802

Network cabling

Service Description

      The Premises Distributed System (PDS) is an integrated general transmission system. Using standardized voice, data, image, and monitoring equipment, each line is comprehensively configured on a set of standard wiring system, and the wiring design, installation and construction, and centralized management and maintenance are unified. Provides advanced and reliable wiring methods for buildings and parks. It is the foundation of communications, computer networks, and intelligent buildings. As far as the integrated wiring system is concerned, it is the engineering rather than the material, because what the user buys is not just the wiring material or the cables and connectors of other manufacturers, but the entire system. So which product to choose is important, but more important is the service of installing and debugging these products.

Service Content

▽Enterprise LAN integrated wiring  

▽Industrial park factory integrated wiring 

▽Campus network integrated wiring

▽Intelligent building integrated wiring

▽Multifunctional commercial center integrated wiring

▽Special environment integrated wiring

Implementation Steps


※Scheme demonstration: Propose a reasonable design plan based on the user's application function and architectural characteristics, especially the business development trend in the next 15 to 20 years.

※System selection: According to the characteristics of the application, select the system product with the best performance-to-price ratio that meets the application conditions.

※Engineering construction: It requires complete construction design drawings, experienced engineering construction team, strict quality control management measures, clear construction progress plan, and high-quality completion of construction.

※System acceptance: After the completion of the system construction, a comprehensive acceptance test is required for the project. The test should clarify the test procedures, test methods, test equipment, test parameters, result confirmation, and quality assurance system application.

※Document description: The document is an important basis for users to apply and maintain the wiring system in the future. The complete document system should include construction drawings, construction records, test reports, product descriptions, wiring codes and identifications.

※System training: In addition to the product training provided by the manufacturer, the project contractor shall provide detailed explanations to the user’s technical personnel on the application and maintenance of the project, and guide them to operate on-site.

      In the course of practice, we provide different network wiring solutions for different users according to the different requirements of customers for network wiring, and tailor the implementation details of network wiring for users, and do our best to meet the international standards of integrated wiring. Customers save resources and avoid unnecessary waste.